Louisiana State University Health Sciences Center Administration & Finance
 

Wednesday, October 22, 2008

 

1542 TULANE AVE. :

  • The general contractor continued drywall repairs in offices on the 2nd and 3rd Floors and in the lounges.
  • The electrical contractor continued installing new light fixtures in Conference Room 524.
  • The fire alarm contractor continued roughing in strobes and speakers in the lounges on the 5th, 6th and 7th Floors. 
  • The construction cleaning contractor continued work on the 8th Floor and started cleaning on the 7th Floor. 
  • Facility Services continued to work on punch list items on Floors 5 through 8.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor installed wood supports for the handrails and baseboards in Auditorium B and framed the soffit for the ceiling in Auditorium A. 
  • The electrical contractor installed wiring and conduit for the sconces and receptacles in Auditorium B.

 

DENTAL CAMPUS 6th & 8th FLOOR LAB RENOVATIONS:

  • The mechanical contractor installed horizontal gas and vacuum piping inside the interior wall of Room 8405.

 

EXTERIOR/LANDSCAPING WORK:

  • Facility Services continued grading landscape and setting planter bed edging in front of 1542 Tulane Avenue .

 

LIBRARY COMMONS:

  • The contractor installed fire sprinklers near the Library entrance.
  • The contractor installed ductwork near the Library entrance.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor insulated additional supply duct on the 6th Floor.
    • They continued to install supply lines from the AHU in the mechanical room on the 1st Floor.
  • The sprinkler subcontractor installed additional sprinkler heads on the 6th Floor.
  • The installation of the new laboratory casework on the 7th Floor is proceeding.
  • The electrical subcontractor installed lights on the 6th Floor on the CSRB side of the building.
    • Electricians ran wire for the new lights in the elevator lobby on the 6th Floor.
  • The contractor installed door frames on the 6th Floor on the Gravier St. side of the building.
    • A crew continued installing fur downs on the 6th Floor S. Prieur side.
    • The fur downs on the 6th Floor CSRB side were taped and floated.
    • A crew began cleaning the granite on the outside of the building on the Bolivar St. side of the 1st Floor. 

 

MEB MDL-5 LAB RENOVATIONS:

  • The contractor installed coax cables and the control boxes for the 65” and 42” LCD monitors. 
  • The contractor installed countertops for the pedestal frames in the MDL lab.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued to skim coat the pans of the honeycomb ceiling.
  • They started to install ceiling supports for the drop ceiling on the South Roman St. side of the lobby.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor installed four additional rows of porcelain tile between the A and B Towers.