Louisiana State University Health Sciences Center Administration & Finance
 

Monday, December 01, 2008

 

1542 TULANE AVE. :

  • The electrical contractor continued installing new light fixtures in the lounges on the 2nd and 3rd Floors. 
  • The elevator contractor continued removing the protective film on Elevator 3.  
    • All elevators are in service except number 3. 
  • The furniture vendor installed cabinets in the 6th Floor lounge.
  • The general contractor commenced drywall installation in Room 545.
  • The painting contractor began painting the front stairwell on the Charity end of the hall.
  • The network wiring contractor checked new data wiring on the 6th Floor and started installing new drops on the 5th Floor. 
  • Facility Services installed four new exterior lights at the back of the building along the sidewalk leading to the Walk to Wellness.
    • They continued making minor repairs on various floors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor floated and sanded the sheetrock ceiling in Auditorium B. 
  • The mechanical contractor installed the heating water return line for the AHU serving Auditorium A.
  • The electrical contractor installed wall sconces on the east wall of Auditorium B.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor insulated chill water lines, heating hot water lines, and condensate lines on the east side of the 1st Floor.
    • They insulated fire dampers on the 6th Floor.
    • Crews demolished duct work and water pipes in the 6th Floor lab.
    • Plumbers set plumbing fixtures in the rest rooms on the east side of the 6th Floor.
  • The electrical subcontractor ran conduit for Panel 2AC on the 2nd Floor.
    • They continued to run conduit for the new switchgear on the 2nd Floor.
    • A crew demolished the old electrical wiring in the 6th Floor lab.
  • The steel subcontractor fastened landing supports on Floors 1 through 5 of the exterior stairwell.
  • The contractor installed doors by the simulation rooms on the 6th Floor.
    • They installed fire walls on the 2nd Floor by the stair tower, north side.

 

LIBRARY COMMONS:       

  • The flooring contractor installed tile in the café area.

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The sprinkler subcontractor installed sprinkler pipe on the east and west side of the lobby.

 

MEB MDL 6 RENOVATIONS:

  • The contractor continued removing existing casework from the main MDL lab area.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor began removing the existing glass from the storefront system.