Louisiana State University Health Sciences Center Administration & Finance
 

Tuesday, December 16, 2008

 

1542 TULANE AVE. :

  • The general contractor completed installing carpet in Room 545.
    • They completed installing ceiling tiles in the front hallway of the 5th Floor and began installing ceiling tiles in the 4th Floor lounge.
  • The painting contractor continued work in the rear stairwell.
  • Facility Services continued minor repairs on various floors.

 

DENTAL CAMPUS AUDITORIUMS A & B RENOVATIONS:

  • The general contractor installed additional ceiling grid in Auditorium A.  Two rows remain to be completed.
  • The contractor installed foam insulation inside the new door frames.
  • The electrical contractor installed additional conduit for the electrical panel power feeds.

 

DENTAL 6th & 8th FLOOR LABORATORY RENOVATIONS:

  • The general contractor installed insulation on the exterior walls in Rooms 8405B and 8405K. 
  • The contractor installed framing support rods for all walls in Suite 8405 .

 

EXTERIOR/LANDSCAPING:

  • Facility Services removed old vegetation in front of the Resource Center .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The mechanical subcontractor set water fountains on the 6th Floor, S. Prieur side and installed VAVs on the 6th Floor Gravier/Bolivar St. side.
  • The electrical subcontractor ran conduit for Panel LA6A, wired domestic water pumps to Panel AC2A, wired Riser B to the switchgear breakers on the 2nd Floor, installed and wired Panel 2AB on the 2nd Floor and installed cable tray on the 2nd Floor, Gravier hallway side.  
  • The contractor installed ceiling grid on the 6th Floor on the Gravier/S. Prieur side.
    • They grouted wall tile in the 6th Floor restrooms.
    • Crews primed the marker boards in the 6th Floor simulation rooms.
    • Sheetrock on the 2nd Floor CSRB side is being floated.
    • They installed CMU on the front of the 1st Floor lobby by Elevators 1 and 4.
    • A crew plastered the restroom on the 1st Floor, Bolivar/CSRB side.
    • Floor tile is being installed in the restrooms on the 1st Floor, S. Prieur Street side.

 

LIBRARY COMMONS:       

  • The contractor installed the frieze.   
  • The contractor continued installation of wood panel supports on the columns.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor removed the ceiling grid in the administrative area. 

 

MEB 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor installed sprinkler main piping on the Bolivar St. side of the lobby.

 

MEB MDL 6 RENOVATIONS:

  • The contractor installed piping for hot/cold water and drainage in the 3rd Floor ceiling for MDL 6.
  • The contractor installed sheetrock above the movable partitions.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The contractor removed the mailboxes.
  • The contractor installed wood nailers for roof flashing above the walkway.