Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, MARCH 24, 2009

 

1542 TULANE AVE. :

  • The general contractor continued painting Rooms 111 and 111A.
    • They completed the ceiling work in Room 111.
    • The demolition is proceeding in Rooms 341, 342 and 343.
  • The furniture vendor continued arranging furniture in offices on the 3rd Floor.
  • The mechanical contractor installed a new fan coil unit in Room 341.
  • LSUHSC Facility Services continued making various repairs on the 1st and 3rd Floors.

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services completed trenching and began installing irrigation pipe in the rear of the Resource Center along S. Prieur St .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor began installing the roof of the new stairwell.
    • Crews installed countertops in the 6th Floor computer lounge.
    • Workers continued installing carpet in the computer lounge continued applying plaster on the 1st Floor, Bolivar Street side.
  • The electrical contractor installed lights on the exterior stairs on the S. Prieur Street side. 
    • Electricians installed floor boxes in the southwest simulation room.
    • Workers installed the racks and cable tray in the 6th Floor network closet.
    • They continued installing conduit for the new stairwell lighting and wire molding for the computer lounge on the 6th Floor.
  • Stryker began installing the boom in the mock OR.   

 

LIBRARY COMMONS:

  • The contractor began installing decorative screens and completed installing the magazine racks.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing lights in the center of the curved ceiling.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor completed modifying additional sprinkler heads. 
  • Workers continued roughing in the plumbing and med gas for the administrative area. 
  • The floors in the lab area were floated. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The contractor continued framing and installing sheet rock for the fur down in the expanded lobby area. 
  • Crews patched and skim coated the plaster wall in the A Tower lobby area.

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The electrical contractor installed boxes and conduit for the new fire alarm devices in Suite 8405. 
  • The plumbing contractor connected plumbing utilities for the fume hood in Room 8405H.
  • The general contractor installed the window glass for the doors in Suite 8405 and windows in Rooms 8405I & 8405K.
    • They installed the 6th Floor doors.

 

ALLIED HEALTH/NURSING ROOF REPLACEMENT:

  • The contractor suspended work.  The roof was currently sealed and protected from the heavy rains forecasted for the next few days.