Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, MARCH 26, 2009

 

1542 TULANE AVE. :

  • The general contractor continued demolition in Rooms 341, 342 and 343.
    • Workers are hanging drywall in the 2nd Floor lounge.
    • A crew began making wall repairs in Rooms 235K and 235M.
  • The electrical contractor continued the electrical rough-in for lighting in the 1st Floor lounge.
  • The elevator contractor had the final inspection on Elevators 1, 2, and 3 with Facility Planning and Control. 
    • An inspection by the State Elevator Inspector will be scheduled in the next 30 days.
  • The mechanical contractor installed a new fan coil unit in Room 343.
  • Facility Services continued painting and making electrical repairs on the 1st and 3rd Floors.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:   

  • The contractor began installing ceiling grid in the 1st Floor elevator lobbies.
    • Workers began painting the plaster walls on the 1st Floor, CSRB side.
    • Crews continued installing countertops on the 6th Floor, Gravier Street side.
    • Block walls for flood proofing are being installed in the freight elevator shaft on the 1st Floor.
    • Additional floor tile was installed in the computer lounge and in the 6th Floor elevator lobby. 
  • The electrical contractor continued removing the old feeder cable from the 1st Floor switchgear room.
  • Stryker continued installing the booms and equipment in the 6th Floor simulation rooms.
  • AT&T installed telephone blocks and began wiring from the entrance cable to the AT&T side of the telephone blocks.

 

LIBRARY COMMONS:

  • The contractor installed all of the display cases and decorative screens in the feature wall.
    • They continue to trim out the display cases.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor moved receptacles in the walls for the wall panel installation and provided the power to the automatic doors.

 

MEB MDL 6 RENOVATIONS:

  • The general contractor is completing the final cleanup.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor installed fire alarms in the lab area. 
  • The contractor continued floating the drywall in the closet. 

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor continued skim coating the plaster wall in the C Tower lobby.
  • The electrical contractor roughed in for fire alarms and smoke detectors in the expanded lobby area.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATION:

  • The electrical contractor installed the wall-mounted light fixtures in Auditorium A.
  • The mechanical contractor installed the return air louver for the AHU room in Auditorium A.

 

DENTAL 6th & 8th FLOOR LAB RENOVATIONS:

  • The fire alarm contractor installed the new fire alarm devices in Suite 8405 . 
  • The general contractor cleaned the floors and cabinets, and applied touch-up paint on the walls in Rooms 6333 and 6335.