TUESDAY, APRIL 7, 2009

 

1542 TULANE AVE. :

  • The general contractor continued finishing the new drywall in Rooms 341, 342, and 343.
    • They continued painting the walls and installing ceiling grid in the 2nd Floor lounge.
  • The mechanical contractor continued installing plumbing in the 1st Floor lounge.
  • The network wiring contractor continued installing new drops in the 3rd Floor offices.
  • The roll-up door contractor adjusted the controller for the new garage roll-up door.
  • Facility Services continued painting and completing electrical repairs on the 2nd and 3rd Floors.

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed installing shrubs in the rear of the Resource Center along S. Prieur St .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION: 

  • The contractor installed VCT in the 2nd Floor entry way to the new build out.
    • Crews installed new countertops in the computer lounge.
    • They installed ceiling grid on the 6th Floor, Gravier/S. Prieur Street side.
    • Cove base was installed around the 6th Floor reception desk.
    • The granite cap was installed at the top of the new stairwell.
    • Workers installed ceiling tile in the 1st Floor lobby area.
    • Crews continued painting on the 1st Floor, S. Prieur/CSRB side.
    • They completed waterproofing the freight elevator pit.
  • The electrical contractor roughed in for new exit lights on the 5th Floor, Gravier Street side.
    • They installed lights and receptacles on the 1st Floor, Gravier Street side.  
  • AT&T continued to install wires in the new room on the 2nd Floor to allow for the transfer of the phone line connections from the 1st Floor to the 2nd Floor.

 

LIBRARY COMMONS:

  • The contractor installed wall covering in the small multimedia room.
  • The contractor made minor repairs to the display cases.  
  • LSUHSC Facility Services electricians installed egg lights and receptacles in the multimedia rooms.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed sheetrock on the soffit across from the elevator. 

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The casework contractor continued installing the peninsular casework in Room 5219.

 

RESIDENCE HALL LOBBY EXPANSION: 

  • The interior contractor continued installing sheetrock and taped and floated the fur down in the expanded lobby area. 
  • The contractor continued relocating the fire sprinkler heads between the A and B Towers.
  • The contractor demolished the old network closet.

 

ALLIED HEALTH/NURSING RE-ROOFING:

  • The contractor removed the roof section parallel to Gravier St around the elevator penthouse and applied the two-ply temporary roof. 

 

DENTAL SCHOOL AUDITORIUM A & B RENOVATIONS:

  • The electrical contractor installed Unistrut in the elevator lobby for the additional overhead conduit.

 

DENTAL SCHOOL 6TH AND 8TH FLOOR LAB RENOVATIONS:

  • The architect held the inspection by the State Fire Marshall.
    • Both the 6th & 8th Floor fire alarms passed inspection.