Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, MAY 18, 2009

 

1542 TULANE AVE. :

  • The contractor primed the walls in Room 112.
  • Crews finished installing the cabinets in the 2nd Floor lounge.
  • Facility Services worked on 4th Floor fan coils (Room 441) and continued electrical repairs on the 1st Floor.

 

EXTERIOR/LANDSCAPING:

  • Facility Services graded the planting beds at the corner of Perdido St. and S. Roman St .

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The mechanical contractor installed the drinking fountain on the S. Prieur St. side of the 1st Floor and a sink in Room 155.
    • Workers continued installing the 1st Floor, Bolivar St. restroom lavatory fixtures.
  • The contractor installed spandrel glass, break metal, and granite on the outside of the exit stairwell door            on the 1st Floor.
    • Crews installed wall tile on the Bolivar St. side of the 1st Floor.
    • The sheet vinyl flooring in the 6th Floor simulation rooms was waxed.
    • They mudded above and around the doors and windows of the stairwell on the 5th and 6th levels.
  • The electrical contractor installed lights in the 6th Floor stairwell and ran wire to the floor boxes in the 6th Floor computer lounge.

 

RESIDENCE HALL LOBBY EXPANSION:

  • The flooring contractor installed floor tiles in the B & C Tower lobby area.

 

LIBRARY COMMONS:

  • The contractor installed door transoms.
  • LSUHSC Facility Services installed piping for the kiosk water softener.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • The contractor completed insulating piping on roof top unit one (RTU #1).
  • Crews continued insulating valves on RTU #1 and continued insulating piping on RTU #2. 

 

MEB MDL 3 RENOVATIONS:

  • The contractor raised the steel track support for the partition panel.
  • They began framing the support track for the partition wall. 

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed wooden wall panels near the Womens restroom.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The network wiring contractor continued pulling network wires in the lab area. 
  • The contractor continued to install wire molding and exit lights.

 

ALLIED HEATLH/NURSING RE-ROOFING PROJECT:

  • The contractor continued replacing the parapet wall cap along Gravier Street .   

     

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed new tables in Auditorium B.
  • The electrical contractor installed and energized the main breakers for the new transformers and sub-panels.
  • The IT and AV racks were installed in Room 4202B.