Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, MAY 29, 2009

 

1542 TULANE AVE. :

  • The contractor worked on punch-list items: removing paint overspray in the upper level of the auditorium and capping plumbing lines in the old section.
  • LSUHSC Facility Services continues painting in Suite 235 .

 

EXTERIOR/LANDSCAPING:

  • LSUHSC Facility Services prepared planting beds along Bolivar St. adjacent to the Residence Hall and continued installing new tree grates around the MEB.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:    

  • The contractor certified the fire pump and it is now in service.

 

LIONS BUILDING 8th FLOOR NETWORK CLOSET:

  • The contractor continued framing studs and installing sheetrock.

 

LIBRARY COMMONS:

  • The restoration specialist continued repairing the frieze. 
  • The contractor continued framing and installing sheetrock for the center stairwell wall.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • LSUHSC Facility Services completed staging temporary air conditioning units to support the temporary air conditioning for 6th and 7th Floor Quadrant D.

 

MEB MDL #3 RENOVATIONS:

  • The contractor framed the stud walls for the alcove area across from MDL #5.

 

MEB PHARMACOLOGY LAB RENOVATIONS:

  • The contractor continued working on general cleaning in the lab area.

 

ALLIED HEALTH/NURSING RE-ROOFING PROJECT:

  • The contractor began to installing the cap sheet on the main roof on the Bolivar street side. 
  • They continued installing pitch pan for exhaust fan on the Bolivar street side.

     

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The electrical contractor set the floor boxes for the lecterns in both auditoriums. 
  • The contractor installed additional acoustical panels in Auditorium A along the wing walls.