  • The electrical contractor installed light fixtures on the 1st Floor. 
  • The furniture contractor continued setting up furniture in the 2nd Floor offices along the center corridor. 
  • The cleaning services contractor cleaned light fixtures and window sills on the 2nd Floor. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing irrigation piping on the Gravier Street side of the Roman Street parking garage.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:     

  • The contractor worked on the punch list for the cove base on the 6th Floor.

 

ALLIED HEALTH/NURSING BLDG. RE-ROOFING PROJECT:

  • The contractor continued installing the sheet metal flashing along Perdido and Bolivar Streets. 
  • The contractor applied the first coat of paint on the elevator penthouse.  

 

LIBRARY COMMONS:

  • The contractor completed installation of the wall covering in the stairwell wall nearest the elevators.
  • The installation of additional wall covering is continuing.

 

RESIDENCE HALL 2nd FLOOR LOBBY EXPANSION:

  • The contractor placed the floor underlayment in the A and C quadrant areas to be carpeted.  
  • Sprinkler heads were installed in the mezzanine of the B quadrant.
  • Fire alarm devices were installed in both mezzanines. 
  • Crews floated the walls in the recreation room. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continues to monitor and adjust the C Quadrant temporary units on the 6th and 7th Floor.
  • The contractor continued installing controls for air handling units 6D and 7D.
  • They continued installing ductwork, piping, and electrical for AHUs 6C and 7C.
  • AHUs 6A and 7A were delivered and stored in the T-lot.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor painted fire alarm conduit white to match the existing ceiling color.

 

MEB PHARMACOLOGY RENOVATION:

  • LSUHSC Facilities Services installed locks on all doors in both the lab and administrative areas. 

 

MEB MDL #3 RENOVATIONS:

  • The casework contractor installed the sink base cabinets. 
  • The A/V contractor installed all four television mounts. 
  • The contractor continued roughing in the natural gas piping.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor installed custom baseboard along the north wall in Auditorium B. 
  • The A/V contractor pulled fiber for the projectors in Auditorium B.

 

DENTAL SCHOOL PARKING LOTS:

  • Facility Services finished painting parking stall markings along Campus Road .