Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, JULY 22, 2009

 

1542 TULANE AVE. :

  • Facility Services applied touch-up paint in 1st Floor offices.
  • Facility Services continues to make electrical repairs in Rooms 235J, 235K, and 235N.

 

EXTERIOR LANDSCAPING:

  • Facility Services continued removing plant material from the front of the Roman Street Garage along Tulane Avenue in preparation for planting.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor terminated data lines in the conference room tables on the 6th Floor.
  • They tested data lines for the additional office drops on the Gravier Street side of the 6th Floor.

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor continued installing wood cladding around the network closet.
  • Crews continued patching and sanding walls throughout the lobby.
  • The painters began priming in the A Tower lobby area.

 

ALLIED HEALTH/NURSING BLDG. ROOF REPLACEMENT:

  • The contractor removed and re-applied the existing caulk in the joints along Bolivar Street of the Atrium.
  • They completed the removal of the exterior elevator and removed the concrete pad for the exterior elevator. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting temporary AC units for the B Quadrant (corner of Perdido Street and South Roman Street ).
  • The contractor continued installing new insulation and electrical for air handling unit 6-B and 7-B.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor began installing carpet in the medical center store.

 

MEB 4th FLOOR MDL #3 RENOVATIONS:

  • The contractor began installing the partition door frame and door in Room 4108A.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The A/V contractor started and tested additional A/V equipment at the podiums in Auditorium A.
  • The contractor continued to work on punch-list items in both auditoriums.