1542 TULANE AVE. :

  • The coffee kiosk for the 1st Floor lounge was delivered.
  • Facility Services continues applying touch-up paint in the 1st Floor offices along Tulane Ave.   
  • The contractor completed installation of CMU for the pipe chase on the 1st and 2nd Floors. 
  • The network wiring contractor installed data runs in Rooms 228 and 240A.

 

LIONS/LSU CLINIC PERMANENT REPAIRS AND MITIGATION:

  • The contractor provided emergency power to the fire pump room. 

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor continued priming the stairwell door frames and elevator door frames.
  • The flooring contractor installed porcelain bases in back corner lobby area of the A & C Towers .

 

ALLIED HEALTH/NURSING BLDG. ROOF REPLACEMENT:

  • The contractor continued installing aluminum flashing around the 4th Floor ledge near Gravier Street .

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services is transferring the temporary AC units from the B to the A Quadrant (corner of South Roman Street and the MEB loading dock) in preparation for the installation of the next pair of new air handling units.
  • The contractor continued installing and insulating new hot water piping for AHUs 6-B and 7B.
  • They are testing and balancing the two new units.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor caulked all of the door frames. 
  • The furniture contractor completed furniture installation.

 

MEB 4th FLOOR MDL #3 RENOVATIONS:

  • The contractor installed door for the partition Storage Room 4210A.

 

MEB 7th FLOOR PHYSIOLOGY LAB RENOVATIONS:

  • The contractor installed wood blocking in Room 7244 and removed sheetrock in Rooms 7221, 7241, & 7250.
  • The contractor began taping and floating the sheetrock repairs.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The contractor continued testing network wires in Auditorium B and completed punch list items in Auditorium B. 
  • A/V contractor conducted heat tests for the projectors in Auditorium A.