1542 TULANE AVE. :

  • The contractor painted the rear wall of the 1st Floor coffee kiosk station.
  • The contractor installed the counter top and the electrical subpanel for the kiosk. 
  • The contractor replaced broken windows on the 3rd Floor.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The demonstration of the new multi-media system installed in the auditoriums was successful.

    

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in the A Quadrant (corner of South Roman Street and the MEB loading dock).
  • The insulation of the chilled and heating hot water piping at AHU 6A is complete.
  • The control wiring for AHU 6A is finished.
  • The fire alarm wiring for AHU 7A is complete.

 

LANDSCAPING:

  • Workers continued with the planting along the Tulane Ave. side of the Roman St. Garage.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed the hidden doors.

 

MEB 7TH FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor painted the 1st finish coat in Rooms 7221, 7241, 7244, and 7250. 
  • The contractor roughed in the gas line in Room 7244.

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The furniture contractor began installing the security desk station in the expanded lobby area. 
  • The contractor relocated the exit sign and pull station to the new wall by the telephone panel.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor placed equipment on the roof.