Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, SEPTEMBER 16, 2009

 

1542 TULANE 2nd FLOOR GARAGE ENTRANCE:

  • The contractor installed wall framing for the 2nd Floor Parking Garage Entrance.
  • The contractor framed the opening for the utility access panel in Room 203.

   

EXTERIOR/LANDSCAPING:

  • Facility Services continued demolition in the T-lot in preparation for landscaping.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C units in the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
  • The contractor continued installing ductwork and piping for AHU 4-C and 5-C. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor continued installing countertops in Rooms 7221, 7241, and 7250.
  • The contractor trimmed out the electrical in Rooms 7241 and 7250.

 

RESIDENCE HALL RENOVATIONS:

  • The contractor installed a door frame and door by the telephone panel.