1542 TULANE 2nd FLOOR GARAGE ENTRANCE:

  • The contractor framed the walls in Rooms 203 and 242B.
  • Workers created a rough opening between Rooms 202A and 203.
  • The mechanical contractor installed isolation valves on the heating and chilled water lines and removed the existing fan coil unit and piping in Room 203.

 

DENTAL SCHOOL AUDITORIUM A & B RENOVATIONS:

  • The contractor roughed in for the access control components. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed irrigation piping around the T-lot.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C units in the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
  • The contractor insulated piping for AHU 4-C.
  • They continued installing electrical and control wiring for AHU 4-C and 5-C. 
  • AHU parts for 4-A, 4-B, 5-A and 5-B were moved to the T-lot for temporary storage.

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor continued installing the new lab countertops in Room 7244.
  • Crews continued installing electrical raceway and receptacle outlet for the center islands in Rooms 7221, 7241, and 7250.

 

MEB MORGUE AUTOPSY HVAC UPGRADE:

  • The contractor removed the existing exhaust duct on the 1st Floor.