Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, OCTOBER 28, 2009

 

1542 TULANE AVE. :

  • The contractor primed the plaster corridor walls for the 2nd Floor corridor build-out.

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed conduit for lighting bollards on the Gravier Street side of the Roman Street Parking Garage.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
  • The contractor completed hot water piping for air handling unit 4-A.
  • They continued installing ductwork and piping for AHU 4-A and 5-A.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor roughed-in the electrical wiring in Room 4210.

 

MEB 2ND FLOOR AUTOPSY ROOM HVAC UPGRADE:

  • The contractor demolished the chase wall by Stairwell #5.

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor installed new ballast and replaced bulbs for pendant fixtures.

 

RESCOURCES CENTER ROOF REPLACEMENT:

  • The contractor replaced one glass panel in the atrium roof near Tulane Ave.  
  • The contractor installed the wood nailer for the aluminum flashing along Bolivar and Tulane Streets. 

 

LIONS/LSU CLINIC 8TH FLOOR RENOVATIONS:

  • The contractor started installed studs for the curved wall.

 

UPTOWN CAMPUS CHILLER REPLACEMENT:

  • The contractor installed insulation on chill water piping.