Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, NOVEMBER 23, 2009

 

1542 TULANE AVE. :

  • The contractor completed the fan coil installation for the 2nd Floor garage corridor.
  • Crews installed the topping for the concrete landing at the 1st Floor garage entrance.

 

FENCING PROJECT:

  • The contractor installed the remaining fence fabric along the DeSaix Subdivision. 
  • All neighborhood chain link fence work is complete.  

 

EXTERIOR/LANDSCAPING:

  • The contractor laid asphalt adjacent to the new curb on Bolivar Street between Poydras Street and Perdido Street .
  • Facility Services continued installing irrigation piping at the corner of Bolivar and Perdido Streets.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C in Quadrant D of the 2nd and 3rd Floors.
  • The contractor completed the pipe insulation and continued installing electrical and controls for AHU 2-D and 3-D.   

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor installed the cap sheet on the mechanical room penthouse.
  • They caulked the interior of the atrium and water tested the Tulane St. and Gravier St. sides of the atrium roof. 

 

LIONS/LSU CLINIC BLDG 7TH FLOOR LAB RENOVATIONS:

  • The contractor continued the demolition of the old sheetrock and wall framing.      
  • Workers installed three valves on the heating hot water lines. 

 

LIONS/LSU CLINIC BLDG 8TH FLOOR RENOVATIONS:

  • The contractor started framing the curved fur down in the main conference room. 

 

MEB MDL 4 RENOVATIONS:

  • The contractor continued installing ceiling grid in Rooms 4210, 4112A, and 4215A
  • The floor in the main MDL room was patched and leveled.

 

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor continued installing ductwork inside the autopsy room.

 

MEB EXTERIOR SIGNAGE:

  • The contractor removed the “LSU Medical” portion of the exterior sign and caulked the old holes.