  • The contractor painted the ceiling tiles in the main corridor outside of the 2nd Floor garage entrance and installed the access panel in Room 202.  

 

CITY PARK CAMPUS:

  • The contractor installed the top rail, bottom rail, and fence fabric along the de Saix Subdivision from Moss Street to the security camera.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
  • The contractor completed the electrical work for AHU 4-A and 5-A.
  • Workers continued installing the controls for AHU 4-A and 5-A.   

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS:

  • The contractor completed framing for the mail room and started framing the ceiling fur down along the lab side. 

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor replaced one additional row of glass.  Four out of fourteen rows have been completed.
  • The contractor completed the plywood backing installation along South Prieur St. and started the first ply of flashing along Bolivar Street . 

   

MEB AUTOPSY HVAC EXHAUST UPGRADE:

  • The contractor continued to hang new exhaust ducts near the freight elevator.

    

RESIDENCE HALL LOBBY RENOVATIONS:

  • The contractor delivered the lift the site.
  • The contractor installed the tile surrounding the concrete bench.

 

MEB MDL 4 RENOVATIONS:

  • The contractor taped and floated the walls in Room 2104.