Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, DECEMBER 22, 2009

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued roughing in electrical conduit and boxes for lighting.
  • Crews ran drain lines on the 6th Floor.   
  • They framed up the concrete curb for the ice machine. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C in Quadrant C of the 2nd and 3rd Floors. 
  • The contractor continued ductwork installation and electrical/controls installation for AHU 2-B.  

 

MEB 4TH FLOOR MDL 4 RENOVATIONS:

  • The contractor continued installing lab furniture in the main MDL room. 
  • They installed ceiling tiles and light fixtures in Room 4210. 
  • The speakers were installed in the main MDL room.

 

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor continued installing ductwork in the Womens bathroom on the 2nd Floor.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor installed the walkway pads, and touched up the flashing along the exterior of the building. 
  • Workers removed the caulk joints from the main penthouse. 
  • They installed copper paper and an aluminum cap to the parapet wall. 

 

MEB 3rd FLOOR A/V UPGRADE INSTALLATION:

  • The contractor installed the ceiling tile and grid in Seminar Room 7/8.