Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, DECEMBER 23, 2009

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS

  • The contractor continued roughing in electrical conduit and boxes for lighting.
  • Crews continued running the new drain lines above the ceiling on the 6th Floor.   
  • The base for the concrete curb for the ice machine was poured.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor hung sheetrock on the curved wall. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C in Quadrant C of the 2nd and 3rd Floors.
  • The contractor continued ductwork installation and electrical/controls installation for AHU 2-B. 

 

MEB 4TH FLOOR MDL 4 RENOVATIONS:

  • The contractor continued installing lab furniture in the main MDL room. 
  • They connected electrical wiring for the lab furniture receptacles. 
  • Workers pulled A/V wiring in the main MDL room.

 

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor connected the supply ductwork in the Womens bathroom on the 2nd Floor.

  

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor continued to install the parapet wall cap along Bolivar Street .