Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, FEBRUARY 2, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor removed studs from Stairwell 2.
  • Workers continued removing sheetrock and metal studs from the Tiger Room.

EXTERIOR/LANDSCAPING:

  • Facility Services completed installing irrigation piping for the main lines in the island and on the Clinic Building side of the horseshoe.
  • They completed installing all control wiring to valves around the horseshoe.
  • Workers trenched for the new irrigation piping in front of the Administration Building and backfilled the trenches nearest the backflow preventer on the field side of the horseshoe.

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

  • The contractor installed emergency power electrical conduit in the mechanical room.
  • Heating hot water pipes were run to VAV boxes.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor installed sheetrock around the top of the curved storefront wall.
  • Facility Services finished running heating hot water pipes to the new VAV boxes.
  • Metal ductwork was installed in the large conference room.

MEB MDL 4 RENOVATIONS:

  • The contractor programmed the A/V equipment and continued working on punch list items.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor removed tile walls from the restrooms on the 1st Floor.
  • They continued installing conduit on the 1st Floor between the new switchgear location and riser B.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor removed the parking lot car stops from the building site.

RESIDENCE HALL LOBBY ROOF FLASHING:

  • The contractor removed the window frame in apartment B34 and began installing the flashing.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor continued installing and programming modules in the new fire alarm summary panel and shifting the new devices from the old panel to the new panel.