Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, JANUARY 20, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to remove metal studs and glass storefronts from the 1st Floor near Bolivar Street.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The demolition phase of the project is getting underway.
  • The contractor began removing metal studs from the 1st Floor and pulling wire from existing electrical outlets on the 1st Floor.

LIONS/LSU CLINIC BLDG 7TH FLOOR LAB RENOVATIONS:

  • The electrical contractor continues to run electrical conduit in the lab space.
  • Workers started running new ductwork and installed the VAV boxes in the lab.

LIONS/LSU CLINIC BLDG 8TH FLOOR RENOVATIONS:

  • The contractor ran additional electrical conduit in the renovated spaces.
  • Crews installed new ductwork and the VAV boxes in the large conference room.
  • The can light brackets have been installed in all of the fur downs.

MEB AHU REPLACEMENT PROJECT:

  • Facility Services continued monitoring the temporary air conditioning serving the cafeteria kitchen area.
  • The contractor completed insulating chilled and hot water piping for AHU 2-A.
  • The electrical and controls work on AHU 2-A and AHU 3-A continues.
  • The Inspecting Engineer and the contractor continued the building walk through and inspection.
  • They completed the inspection of all AHUs on the 2nd through 4th Floors.

MEB MDL #4 RENOVATIONS:

  • The contractor installed marker boards in the main MDL room.
  • The contractor completed installing cove base in the main MDL room and room 4210.

RESOURCE CENTER ROOF REPLACEMENT PROJECT:

  • The contractor made multiple touchups to the metal parapet wall cap.
  • The lightning protection system installation is complete.

RESIDENCE HALL FIRE ALARM SYSTEM UPGRADE:

  • Contractor began installing the new fire alarm summary panel and began the necessary programming.

EXTERIOR/LANDSCAPING:

  • The landscaping crew has moved from the Downtown campus to the Dental School. They will be installing irrigation systems, updating current planting areas, developing new planting beds, etc.
  • Facility Services completed trenching for irrigation piping in the island of the horseshoe and on the Moss St. side of the horseshoe.
  • They started digging trenches for the irrigation piping to be installed between the Clinic Building and the horseshoe drive.