ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing sheetrock and ceilings in Rooms 245 and 256 and removed walls in the 1st Floor bathroom.
  • The contractor installed junction boxes for lighting on the 1st Floor Bolivar street side of the building.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed conduit for branch circuits to electrical outlets on the 1st Floor, Tulane Ave. side of the building.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor taped and floated the sheetrock on the fur down in the elevator lobby.
  • Workers installed sprinkler heads in the large conference room.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor connected plumbing pipes for the lab benches and pulled wires for lighting and receptacles.

RESIDENCE HALL LOBBY ROOF FLASHING:

  • The contractor installed the exterior metal panel in apartment B31.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor installed fire relay modules for the elevator fire service primary and alternate recalls for all 3 elevator penthouses (Tower A, B, and C).

EXTERIOR/LANDSCAPING:

  • Facility Services has completed installing all irrigation in the School of Dentistry horseshoe drive area, filled in all trenches, and began grading the area.