Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, FEBRUARY 26, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor removed carpet and floor tiles from Rooms 245 and 246.
  • Crews pulled additional wire for the 1st Floor lights on the Bolivar Street side of the building.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued dismantling duct work for the AHUs in the mechanical room on the 1st Floor.
  • Workers prepared for the scheduled utility shutdown in the morning.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor installed additional electrical boxes for the AV equipment in the large and small conference rooms.
  • They continued to install ceiling grid in the lobby and reception area.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor continued programming the new fire alarm panel.

FENCE REPLACEMENT PROJECT:

  • The contractor poured concrete for 8 additional monumental columns. This will result in 16 columns having been poured.

EXTERIOR/LANDSCAPING:

  • Facility Services placed and graded topsoil in the center island of the horseshoe drive.