TUESDAY, MARCH 23, 2010

 

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor continued to saw cut the floor in four locations to run drain lines for the bathrooms.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor excavated the 4th of 8 pile caps.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor completed drilling 9 of 16 floor penetrations for the electrical riser and emergency fuel line.

 

CEB COVERED WALKWAY:

·         The contractor started demolition of the old sidewalk that runs parallel to the District Entergy Garage and removed the awning connected to the Clinical Education Building.

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

·         The contractor continued to prep the sheetrock wall.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor continued running conduit from the network closet to the podium in the large conference and small conference rooms.

·         Facility Services finished installing the 8 control valves for the VAV boxes

 

EXTERIOR/LANDSCAPING:

·         Facility Services completed removing existing vegetation from the patio courtyard.

·         They continued trenching for irrigation piping in the courtyard.