Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, APRIL 16, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued laying CMU block in the stairwell near the MEB loading dock.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor removed the forms from the first 2 concrete columns that were poured.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued installing countertops, connecting gas pipes, and terminating data ports for the lab furniture.

CEB COVERED WALKWAY:

  • The contractor began grading the lot and removed the concrete patio along the side of the building.

FENCE REPLACEMENT PROJECT:

  • The contractor set the forms for the final section of sidewalk along Florida Avenue extending to the horseshoe.

DENTAL SCHOOL NORTH FIELD GRADING:

  • The contractor began removing the top layer of vegetation and soil from the site and started the grading work.

LANDSCAPING/EXTERIOR:

  • Facility Services removed additional vegetation on the Florida Avenue side of the School of Dentistry Clinic Building.