WEDNESDAY, JUNE 30, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued to run fire alarm cables to the 2nd Floor fire alarm panel.
  • Crews started removing the mechanical room CMU wall on the 2nd Floor.
  • They ran conduit and set the housing for the relocation of electrical panel D1A.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing the concrete forms from the bottom of the 2nd Floor.
  • They completed installing underground waste line by the C Tower Roman Street side.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed 2 housings for electrical panels in the 2nd Floor switchgear room.
  • Additional electrical conduits were installed in the switchgear room on the 2nd Floor.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor continued building the formwork for the corners and islands.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor completed installing the remaining carpet and tile on the floors.
  • The AV contractor ran wires to the podium in the large conference room.