ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continues to rewire the electrical panels in the 1st Floor electrical room.
  • Workers continue removing metal wall studs from Rooms 218 and 219.
  • They started removing the heating hot water pumps from the 2nd Floor mechanical room.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continues running conduit on the 8th Floor.
  • The contractor created additional penetrations through the roof deck for the conduit that will serve the emergency generator.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor began the electrical rough-in for the 2nd level of the new elevated enclosure.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor built concrete forms for the new driveway and sidewalks.
  • The new sidewalks were poured.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor ran power and conduit to the floor penetration for the podium in the large conference room.