THURSDAY, AUGUST 26, 2010

ALLIED HEALTH PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in the Tiger Room.
  • The contractor continued welding connections for the chilled water lines on the 2nd Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed the metal grating platform on the roof level of the new enclosure.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued installing bus duct in the 2nd Floor switch gear room.
  • The contractor continued relocating fire sprinklers in the 2nd Floor switchgear room.

CEB COVERED WALKWAY:

  • The contractor continued fabricating the rebar for the footers and continued setting the forms for the walkway.