ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor completed rewiring the electrical panels in the 1st Floor electrical room.
  • Crews continued removing metal wall studs and floor tiles from Rooms 214 and 221.
  • 10 ft of heating hot water supply lines were removed on the 2nd Floor.
  • 25 ft of the red exterior panels were removed from the walkway.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor cleaned the 1st and 2nd Floor ductwork.
  • They terminated wires in the 2nd Floor pump room.
  • Workers grouted around the platform on the 1st Floor.
  • The contractor applied the waterproofing to the new CMU walls for Elevators 1 & 2.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed storm drain pipe for the roof of the new building.
  • A crane has been delivered to the site.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor erected the new light poles and mounted the new electrical service equipment.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The A/V contractor continued installing the podium in the large conference room.
  • The contractor installed light bulbs in the new fixtures.