ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued running water lines to the heating hot water pumps. 
  • Workers continued to demolish the 2nd Floor AHUs.
  • They continued to lay CMU block to complete the wall around the installed ductwork along Bolivar Street.
  • The contractor applied the second and third coats of stucco in Stairwell D.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing the exhaust pipe for the emergency generator.
  • A crew continued connecting the electrical conduit to the new switchgear. 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed the second doorframe along with a block wall in the new switchgear room on the 2nd Floor.

CEB COVERED WALKWAY:

  • The contractor installed the curved roof supports between the Clinical Education Building and the District Energy Garage.
  • They installed the supports for the two canopies closest to the CEB.