TUESDAY, DECEMBER 14, 2010

ALLIED HEALTH PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued running conduit for receptacles and light fixtures inside the auditorium.
  • They provided power for the 2nd Floor AHU behind the auditorium and started pulling wire for the 1st Floor AHUs.    
  • The mechanical contractor fabricated fittings for the new domestic water pumps.
  • They ran heating hot water to VAVs and insulated ductwork above the birthing labs on the 2nd Floor. 
  • The contractor continued removing louvers on the switchgear room located on the 1stt Floor. 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor set the emergency generator platform on the roof.
  • Workers continued to weld the fuel line for the emergency generator on the 1st Floor.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits in the basement to relocate existing electrical panels to the 1st Floor.

CSRB EXHAUST UPGRADE:

  • The contractor completed removing the existing exhaust duct on the 1st Floor in the rear corridor.
  • They relocated fire sprinkler lines in the 1st Floor mechanical room.

DENTAL SCHOOL CAMPUS ROAD REPAIRS:

  • The contractor poured the concrete curbs along both driveways.
  • They poured and finished the concrete sidewalks.