MONDAY, FEBRUARY 7, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor installed structural steel for the new storefront on the 2nd Floor.
  • Conduit is being run for the fire alarms on the 2nd Floor.
  • Workers ran heating hot water pipe to the VAVs on the 1st Floor.
  • Exhaust fans were installed in both of the 1st Floor restrooms. 
  • The contractor finished tiling the 1st Floor bathroom.
  • The 1st Floor office areas near Bolivar St. are being painted.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor pulled wires from the 1st Floor electrical closet to the new addition to supply power to the C Tower apartment stoves.
  • The fire pump was set in place on the 2nd Floor of the building addition.
  • The soffit along the balcony was plastered.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The new walls in the bookstore were painted.
  • The electrical receptacles for the new desk in the bookstore were installed.
  • The contractor transferred the power for the emergency lighting in the library to the new switchgear.
  • Steel decking was installed on the 1st section of the mezzanine in the pump room.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing heating hot water and chill water piping in the basement.
  • The excavation in the loading dock area has begun.
  • An electrical junction box was installed in Room 209. 

CSRB EXHAUST UPGRADE:

  • The contractor applied the 2nd of 3 coats of plaster on the ceiling of the 1st Floor.
  • The cooler for the walk-in cooler in Room 6A6 was relocated.
  • Workers cut the floor penetration for Room 722A.

DENTAL SCHOOL AHU REPLACEMENT:

  • The contractor continued installing chilled water lines for the AHU above Oral Pathology.
  • They continued fabricating heating hot water lines for the VAV boxes and tying in the new AHU-drain riser. 

DENTAL SCHOOL LIGHTING REPLACEMENT:

  • The contractor installed 12 light fixtures on the 7th Floor of the Clinic Building.

DENTAL SCHOOL STUDENT RECREATIONAL FIELDS:

  • The contractor set 3 additional catch basins. Seven of the twelve catch basins are now in place.