Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, MARCH 9, 2011

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor began painting the 2nd Floor corridor along Gravier Street.
  • They started installing framing for the 2nd Floor corridor along the MEB loading dock side. 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor made the tie-in connection for the 6 inch fire water supply line on the 1st Floor.
  • The electrical feeder for the MDP-X panel serving the 3rd Floor of B-Tower was installed.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed metal lockers in the restrooms on the 1st Floor.
  • The 4 heating hot water pumps were placed on the 1st Floor.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing 6 inch chilled water pipe in the basement.
  • Electrical conduit was run in Rooms 730 and 627.
  • Workers installed steel rebar for the freight elevator shaft wall in the basement.

DENTAL SCHOOL LIGHTING REPLACEMENT:

  • The contractor replaced 40 lights in the Clinic Buildings 3rd Floor clinic area.