ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor finished coring the 24 floor penetrations for the 2nd Floor auditorium seating.  

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed fire caulk in all three rooms on the 2nd level of the new elevated mechanical/electrical/plumbing structure.
  • Crews removed abandoned electrical conduits on the 1st Floor of the Residence Hall.
  • The contractor removed a wall partition in the old fire pump room on the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing the ceiling in the fire pump room.
  • They began installing the piping for the fan coil unit in the pump room.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued welding and installing chilled water pipe in the basement.
  • They continued removing existing electrical conduits in the basement.
  • Workers continued erecting forms for the elevator shaft walls in the basement.

CSRB EXHAUST UPGRADE:

  • The contractor applied the 2nd of 3 coats of plaster on the 1st Floor ceiling.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued installing spiral ductwork for unit 8D in the Clinic Building.
  • All 13 VAVs have been installed.
  • The contractor installed supply ductwork for units 8A and 8D. 
  • All 14 VAVs for unit L2A have been installed in the Administration Building. 

DENTAL SCHOOL BLDG EXTERIOR WATERPROOFING PROJECT:

  • The contractor continued removing existing caulk and installing new caulk on the north side of the Clinic Building.