ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing doors on the 1st Floor.   

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor painted 8 additional doors on the 1st Floor.
  • Crews completed installing the louvered doors for the fire pump room on the 2nd level of the new elevated structure.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor placed the concrete pad for the fire pump.

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued welding and installing 8-inch chilled water pipes in the basement.
  • They continued demolishing the loading dock roof.

CEB COVERED WALKWAY:

  • The contractor continued installing flashing and snap-on seam strips.

CSRB EXHAUST UPGRADE:

  • The contractor installed exhaust ductwork on the 1st Floor for Room 105. 

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued testing the controls at the VAV boxes near Oral Pathology.
  • The asbestos contractor removed asbestos from the heating hot water and chilled water pipes in the Clinic Bldg. penthouse. 
  • The asbestos contractor removed ductwork from the Faculty Practice area in the Administration Building.
  • The contractor removed the CMU wall near Faculty Practice and removed ceiling tiles and lights from the Library study rooms.
  • Heating hot water lines were removed from Room 2110 (a mechanical room). 

DENTAL CAMPUS PARKING LOT LIGHTING:

  • The contractor continued installing direct-buried electrical conduit between the new light poles.