Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, AUGUST 17, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing conduit on the 2nd Floor and the steam supply line in the basement.
  • Crews continued building forms and installing steel rebar for the next grade beam to be poured in the Lakeside Lot.
  • The contractor poured concrete for the grade beam nearest the basement areaway.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor removed the ductwork from Room 342.
  • Workers continued installing electrical conduit on the 7th Floor for fan systems 9 and 10.
  • The round exhaust ductwork is being installed on the 2nd Floor and in exhaust riser 9.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued insulating the heating hot water line and supply ductwork for unit 6A in the Clinic Building.   
  • Light fixtures were installed in the restrooms on the 3rd and 6th Floors.