CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued erecting steel for the 2nd level of the new elevated mechanical/electrical structure in the Lakeside lot.
  • They continued installing electrical conduit on the 1st Floor.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor continued installing light fixtures, diffusers and sprinkler heads in the 2nd Floor corridors.
  • Ductwork is being installed in Room 722.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:   

  • The contractor continued insulating the ductwork and heating hot water lines on the 5th Floor of the Clinic Building.   
  • Crews continued installing the main supply and return ductwork adjacent to the 5th Floor air handling unit. 
  • The ceilings in the 5th Floor restrooms are being installed. 
  • Plastic laminate wall panels on the 6th Floor were replaced. 
  • The contractor continued to install the ceilings in the 3rd Floor (Administration Building) restrooms and the Library.