MONDAY, OCTOBER 10, 2011

CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued erecting steel framing on the 3rd level of the 2nd bay of the new mechanical/electrical building.
  • Metal door frames for the transformer vault were installed.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor installed the duct riser cross connection for exhaust system #1 on the 4th Floor.
  • Workers began installing the VFDs on the roof for exhaust system #2.

DENTAL SCHOOL AHU REPLACEMENT PROJECT:

  • The contractor continued demolishing the chilled water lines for unit 7D in the Clinic Building. 
  • They continued installing the supply ductwork and VAVs for unit 5B.
  • The abatement for unit 5B was completed and the new unit 5B was set in place. 
  • Crews removed ceiling and lights from the 7th Floor.
  • The contractor continued removing lights and ceiling from the 2nd half of the Library. 
  • Units L4C and L4D were demolished.