CEB PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduit on the 2nd & 3rd levels of the MEP building and storm drain pipe on the 3rd level of the MEP building.

CSRB EXHAUST UPGRADE PROJECT:

  • The contractor started to remove the old exhaust ductwork from the areas included in phase 2B.

DS CLINIC AHU REPLACEMENT   

  • The contractor continued installing ductwork, VAVs, and heating water lines for unit 2B in the Clinic Building.
  • They continued insulating ductwork and heating water lines for unit 4B.
  • Workers began the installation of the ceiling grid on the 4th Floor and the ceiling in the 4th Floor Men’s restroom.
  • An additional 22 light fixtures were installed on the 6th Floor. 
  • The contractor started insulating the chilled water and heating hot water lines for units L2B and L3B in the Administration Building.   
  • Crews continued installing heating hot water lines for unit L2B.
  • The contractor is installing the CMU wall in the Library workroom.  

Resource Center PERMANENT REPAIRS & Mitigation

  • The contractor installed the controls for the heating hot water pumps.