The project to remove over 30,000 bound volumes and shift the entire print journal collection to make room for an IT data center is well underway. If you find yourself on that floor, it is reminiscent of a sticky note factory:

Picture of journals on shelves.
Journals waiting to be removed.

Journals that will be removed from the collection are also starting to populate the staging areas on the Prieur side of the floor:

Picture of bound journals that will be thrown away
Picture of journals stacked on a table

As we make our way through the entire collection, removing and shifting journals, there will be an increase of noise on the usual quiet study floor.