construction

Construction at the Dental Library

Starting Monday, 6/13/2022, contractors will begin repairing the exterior walls and windows in the Dental Library. The perimeter of the Library will be blocked off and there will be some noise, especially at the beginning of the project. Construction is expected to take 3-4 weeks.

We are sorry for the inconvenience this may cause. If you need a quiet place to study, please use the Isché Library on the downtown campus. It is on the 3rd floor of the Administration and Resource Building at 433 Bolivar St.

Thank you for your cooperation and understanding during this process.

5th Floor Construction starting April 28th

A project to cut through the walls on the 5th Floor is set to start on Thursday, April 28, 2022, and is to last for two months. There will be considerable noise in the area.

Once we learned this project was proceeding we asked it be delayed until after exams, but it will begin on Thursday.

Elevated Walkways Closed 1/14-1/17/22

The elevated walkway over Bolivar Street will be closed from 6pm Friday, January 14th to 6pm Monday, January 17th

During this time, the Resource Center Building and the Library will be accessible from the 1st floor entrance only, via your LSUHSC ID. Most of the walkways will be closed over the long weekend, so please plan your visit accordingly.

Isché Library – 5th Floor Construction

A temporary wall was put up on the 5th floor of the Isché Library over the winter break holiday. Library staff are unclear as to the length and scope of work occurring on the 5th floor. It appears part of the floor will be converted to non-library offices. We apologize for any noise or inconvenience this causes.

The water fountain on the 5th floor is now behind the wall so please use the fountains on the 4th or 3rd floors.

Bolivar Street Elevated Walkway Closure July

*Edit2* The walkway will be closed again from 6pm on Friday, July 23rd through 6pm Sunday July 25th.

*Edit* The walkway will be closed again from 6pm on Friday, July 16th through 6pm Sunday, July 18th.

The elevated walkway over Bolivar Street will be closed from 6PM Friday, July 9th to 6PM Sunday, July 11th.

During this time, the Resource Center Building and the Library will be accessible from the 1st floor entrance only.

Please plan your visit accordingly.

Library Lobby Work Downtown

On the downtown campus, the Library Lobby is having both elevator and wallpaper work done at the moment. Prepare to step carefully as you get off the elevator to access the coffee shop (to the right) or the Isché Library (to the left). Work will continue until it’s complete.

Bolivar Street Elevated Walkway Closure May 14 – May 16

The elevated walkway over Bolivar Street will be closed from 6PM Friday, May 14th to 6PM Sunday, May 16th.

During this time, the Resource Center Building and the Library will be accessible from the 1st floor entrance only.

Please plan your visit accordingly.